<?xml version="1.0" encoding="utf-8"?><rss version="2.0">

		  <channel>
    <title>Company News - Herrenknecht</title>
    <link>http://www.miningmagazine.com/company-news/herrenknecht</link>
    <description>Company News For Herrenknecht</description>
    <language>en</language>
<generator>Mysource Matrix</generator>

<item>
   <title>Last Updated - Company Description Updated </title>
   <link>http://www.miningmagazine.com/company-news/herrenknecht</link>
   <guid>http://www.miningmagazine.com/company-news/herrenknecht</guid>   
   <description></description>
   <pubDate>2009-06-16 15:44:00</pubDate>
</item><item>
   <title>Tagged Article - Gautrain hits the 90% mark</title>
   <link>http://www.world-tunnelling.com/global-news/gautrain-hits-the-90-mark</link>
   <guid>http://www.world-tunnelling.com/global-news/gautrain-hits-the-90-mark</guid>   
   <description><![CDATA[Dr Barbara Jensen, a spokesperson for Gautrain, has confirmed that 13,552m – 90% –of the 15km tunnel, which will form part of the Gautrain network, is now complete.]]></description>
   <pubDate>2009-06-04 16:30:28</pubDate>
</item><item>
   <title>Tagged Article - Herrenknecht breakthrough</title>
   <link>http://www.world-tunnelling.com/global-news/herrenknecht-breakthrough</link>
   <guid>http://www.world-tunnelling.com/global-news/herrenknecht-breakthrough</guid>   
   <description><![CDATA[Herrenknecht announced recently that one of its TBMs has broken through six months ahead of schedule on the Erstfield-Amsteg leg of the eastern tube of the Gotthard Base Tunnel(GBT) project in Switzerland.]]></description>
   <pubDate>2009-08-10 17:00:09</pubDate>
</item><item>
   <title>Tagged Article - Pipejacking breakthrough in Victoria</title>
   <link>http://www.trenchless-world.com/global-news/pipejacking-breakthrough-in-victoria</link>
   <guid>http://www.trenchless-world.com/global-news/pipejacking-breakthrough-in-victoria</guid>   
   <description><![CDATA[Australia’s potentially longest-ever single pipejack drive for a 2m i.d. pipe has ended successfully.]]></description>
   <pubDate>2009-08-10 17:38:31</pubDate>
</item><item>
   <title>Tagged Article - Robbins trio dig deep in Mexico</title>
   <link>http://www.world-tunnelling.com/features/robbins-trio-dig-deep-in-mexico</link>
   <guid>http://www.world-tunnelling.com/features/robbins-trio-dig-deep-in-mexico</guid>   
   <description><![CDATA[Mexico City’s wastewater problem will be eased by a TBM-bored tunnel through unique geology, reports Desiree Willis of The Robbins Company.]]></description>
   <pubDate>2009-04-20 16:14:34</pubDate>
</item><item>
   <title>Tagged Article - Rio Tinto expands Mine of the Future </title>
   <link>http://www.miningmagazine.com/panorama/rio-tinto-expands-mine-of-the-future</link>
   <guid>http://www.miningmagazine.com/panorama/rio-tinto-expands-mine-of-the-future</guid>   
   <description><![CDATA[Rio Tinto is expanding its Mine of the Future programme to develop new equipment and systems for deep underground mines and has selected three partners to work on the project.]]></description>
   <pubDate>2010-02-23 17:03:17</pubDate>
</item><item>
   <title>Tagged Article - Designs for Mixshields</title>
   <link>http://www.world-tunnelling.com/features/designs-for-mixshields</link>
   <guid>http://www.world-tunnelling.com/features/designs-for-mixshields</guid>   
   <description><![CDATA[In this abridged paper, Dr Martin Herrenknecht and Dr Karin Bappler review the progress of mechanised tunnelling technology, focusing on current design approaches to soft-ground TBMs.]]></description>
   <pubDate>2009-04-20 16:14:50</pubDate>
</item><item>
   <title>Tagged Article - Victory in sight</title>
   <link>http://www.world-tunnelling.com/features/victory-in-sight</link>
   <guid>http://www.world-tunnelling.com/features/victory-in-sight</guid>   
   <description><![CDATA[Jack Burke reports from Colorado, US, on the Arrowhead East and West tunnels, a part of the Inland Feeder conveyance system which will have a 28.3m3/sec water capacity when completed in 2010.]]></description>
   <pubDate>2009-06-04 16:30:30</pubDate>
</item><item>
   <title>Tagged Article - Herrenknecht's Bosporus break</title>
   <link>http://www.world-tunnelling.com/global-news/herrenknechts-bosporus-break</link>
   <guid>http://www.world-tunnelling.com/global-news/herrenknechts-bosporus-break</guid>   
   <description><![CDATA[On April 13, a Herrenknecht TBM  reached its target shaft on the Asian side of Istanbul having tunnelled under the Bosporus.]]></description>
   <pubDate>2009-06-04 16:30:35</pubDate>
</item>  </channel></rss>