ABB delivers at Andina mine

- Publishing Date
- 28 Jan 2011 4:52pm GMT
- Author
- Mining Magazine
Processing Crushing & Conveying
ABB’s supply consisted of a 13,050kW gearless drive motor, including auxiliary equipment to operate it and a pre-assembled containerised electrical house, plus the mill auxiliary equipment. Andina, 80km northeast of Santiago, outputs over 248,000t/y of copper concentrate. The crush, grind and float line is located in the underground concentrator. ABB said its main challenge was size limitations.
The 7.62m x 11.23m stator had to be delivered through a tunnel of 6m x 6m, and the bridge crane capacity was only 60t. The design typically consists of four parts, but the demands of this project challenged ABB to divide it into five. The gearless mill drive provides maximum control over grinding. By acting as a variable-speed drive, the unit helps mills to start smoothly without any mechanical stress.
Companies in this article
Visit the links below to read profiles, see stock information and read all news on companies mentioned in this article.
ALSO IN THE ARCHIVE...
More News By Subject
Site Search
Log inLatest Issue:
MM May 2012
-
Features
-
Editor's Comment

PROFESSIONAL PLACEMENTS
Chief Operating Officer - TiZir Limited
Key Leadership Role with a $600M Joint Venture Project in West Africa, competitive salary package on offer with Residential and FIFO options.
General Manager Mining - OK Tedi Mining
Ok Tedi Mining Limited operates a world class open pit mine and copper concentrator located in the Western Province of PNG.
Chief Executive Officer - Tin International Ltd
Tin International Ltd. (“TIN”) is in the process of becoming an ASX listed tin development company with assets located in Germany.
RECENT MINING COMPANY PROFILES
SEARCH OUR COMPANY DATABASE


Comments