Publication Navigation

Site Navigation

Tiefenbach automation installation for Newlands longwall

Tiefenbach automation installation for Newlands longwall
Publishing Date
26 Jan 2011 10:05am GMT
Author
Mining Magazine

Crushing & Conveying  


Inbye Mining Services is trialling a prototype installation of the Tiefenbach Control Systems electro-hydraulic roof support control system on one of the powered roof supports at Xstrata’s Newlands Northern mine. Once the trial layout is approved by the mine, the new controls will be installed on the 181 chocks at Newlands Northern in a five-stage, year-long process.

The customised Tiefenbach control kits will be installed progressively on the Newlands roof supports in batches of 35 to 45 roof supports. This process will be staged in a way to minimise interruptions to the Newlands coal production.

Inbye is customising the German automation technology to not only meet the mine’s requirements, but also to increase equipment longevity and operating efficiency.

"The automation of the Newlands longwall system cements Inbye's prominent position in the repair and overhaul of longwall equipment and as a supplier of automation control hardware and software systems,” Inbye managing director Richard Eveleigh said.

Newlands Northern was the second-most productive Australian longwall mine in the 2009-10 financial year, with output of 8.87 million tonnes run-of-mine.

Inbye is allied with Polish roof support manufacturer Tagor SA and the Nepean engineering group, which both supplied longwall equipment for Vale’s Carborough Downs mine.

 


More News By Subject

Comments

Site Search

Log in
Latest Issue: MM May 2012
MM-May-2012.jpg


 

PROFESSIONAL PLACEMENTS
Professional Placements

Professional PlacementsGeneral Manager Processing - OK Tedi Mining

Ok Tedi Mining Limited operates a world class open pit mine and copper concentrator located in the Western Province of PNG.

Professional PlacementsChief Operating Officer - TiZir Limited

Key Leadership Role with a $600M Joint Venture Project in West Africa, competitive salary package on offer with Residential and FIFO options.

Professional PlacementsChief Executive Officer - Tin International Ltd

Tin International Ltd. (“TIN”) is in the process of becoming an ASX listed tin development company with assets located in Germany.