Karowe UGP is planned to extend the mine life to at least 2040
22 February 2023
The underground expansion programme has an estimated capital cost of $514 million
24 March 2021
Lucara has added another XRT technology line to process finer-size fractions at its operation in Botswana
25 August 2016
Recovery circuit design showed foresight which has been vindicated
08 December 2015
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.