MDM Engineering Group is set to complete the detailed feasibility study and front-end engineering and
24 July 2013
MDM Engineering Group plans to complete a design update and cost revalidation of the bankable feasibility
02 August 2011
MDM Engineering Group has been awarded the increased throughput design update and cost revalidation of
20 June 2011
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.