DRA secures project for Polyus Gold

DRA secures project for Polyus Gold

Polyus Gold has awarded DRA Global its first project in Russia

Design / Build

24 JUL 2018
Ups and downs of the 'banana' screen design

Ups and downs of the 'banana' screen design

Multi-slope screens are commonly used, but need to be carefully designed for the specific purpose

Design / Build

23 JUL 2018
SIMPEC to work on Talison lithium processing plant

SIMPEC to work on Talison lithium processing plant

SIMPEC has been awarded a key contract for the Talison Lithium Greenbushes operation

Design / Build

17 JUL 2018
Outotec to deliver technology to Russia

Outotec to deliver technology to Russia

Outotec will deliver minerals processing technology and equipment to a concentrator plant in Russia

Design / Build

13 JUL 2018
Hudson pleased with progress at White Mountain

Hudson pleased with progress at White Mountain

Hudson Resources is targeting calcium feldspar processing in Greenland by the end of this year

Design / Build

10 JUL 2018
Commissioning starts at Pilgangoora

Commissioning starts at Pilgangoora

First concentrate production is expected by end of June

Design / Build

15 JUN 2018
Hazer Group, Mineral Resources 'progressing well' with pilot plant

Hazer Group, Mineral Resources 'progressing well' with pilot plant

Stage 1 is moving forward toward commissioning in the September quarter

Design / Build

14 JUN 2018
Bacanora's current timeline for plant commissioning is 20 months

Sonora slides forward

UK-based company targeting final designs, cost release for Mexico facility late this month

Design / Build

06 JUN 2018
Rare-earth refinery moves forward in UK

Rare-earth refinery moves forward in UK

Peak Resources gets planning green-light for its Teesside rare-earth separation refinery

Design / Build

01 JUN 2018
DRA Global secures Sierra Rutile EPC project

DRA Global secures Sierra Rutile EPC project

DRA secures contract with Sierra Rutile to expand of its mineral sands operations in Sierra Leone

Design / Build

29 MAY 2018
Clough to work on Alcoa impurity processing facility

Clough to work on Alcoa impurity processing facility

Clough will develop an impurity processing facility for Alcoa's Wagerup alumina refinery

Design / Build

23 MAY 2018
Baobab picks up Wood for expansion project

Baobab picks up Wood for expansion project

Avenira has chosen Wood as its lead engineering consultant for the Baobab bankable feasibility study

Design / Build

23 MAY 2018
Gold mine plant gets pipe fittings

Gold mine plant gets pipe fittings

Piping specialists supply Burkina Faso mine with HDPE injection-moulded fittings

Design / Build

16 MAY 2018
Tasiast contract goes to Wood

Tasiast contract goes to Wood

Wood has been awarded the EPC contract for the second phase of expansion at Tasiast in Mauritania

Design / Build

15 MAY 2018
Browns Range on the cusp of production

Browns Range on the cusp of production

Northern Minerals has begun commissioning of the pilot plant at Browns Range

Design / Build

08 MAY 2018
Capricorn chooses GR Engineering

Capricorn chooses GR Engineering

GR Engineering is slated to design and construct a 3Mt/y CIL plant and associated infrastructure for

Design / Build

23 APR 2018