Theta plans to bring four mines into production within the next five years.
20 July 2020
Plant to provide 30% of the Evander mines's power need and reduce reliance on national grid.
13 July 2020
Going electric lowers ventilation and diesel storage costs.
06 July 2020
Each PWR BLOKs corresponds to 18 MW ni power generation
01 July 2020
Modular equipment was chosen for the high-altitude site.
25 June 2020
The filters are to improve the physical and chemical stability of the tailings.
23 June 2020
The company plans full baseline COVID-19 testing of staff and contractors.
16 June 2020
Symboticware wants the deal to expand accessibility to its telemetry products.
15 June 2020
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.