PROCESSING

FLSmidth wins Volta Grande EPC contract

Belo Sun Mining has awarded FLSmidth the first phase of an engineering, procurement and construction (EPC) contract for the Volta Grande gold mine processing plant in Brazil's Amazon region

Staff reporter
FLSmidth wins Volta Grande EPC contract

The Volta Grande gold project is located on the Xingu River, some 50km southwest of Altamira in Pará state, Brazil. The contract awarded to FLSmidth includes the completion of basic engineering, selection...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions

editions

Mining Magazine Intelligence Exploration Report 2023 (feat. Opaxe data)

A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.