A flash flood in April at Perkoa breached two embankments outside the mine
15 September 2022
Search crews will continue to search "24 hours per day" for the missing miners
09 May 2022
The flood eroded the decline ramp which provides primary access to all levels of the mine
25 April 2022
Trevali's guidance for 2022 zinc production is estimated to be between 274 and 280 million pounds
19 April 2022
Drilling was stopped after the town of Merritt was ordered to evacuate.
18 November 2021
"One-off" factors were behind the decline
20 July 2021
Dam enables a full scale dewatering of the flooded mine pit
16 June 2021
Ore mining volumes are back to full capacity of 14,100 tonnes per day
14 May 2021
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.