Solutions stack covers tailings thickening and dewatering
26 April 2022
Vale plans four plants at an estimated total cost of US$2.3 billion.
17 March 2021
Project involves the creation of a small dry-stack tailings area
22 December 2020
Vale estimates that by 2024, 70% of its production will come from dry or natural moisture processing
16 July 2020
The filters are to improve the physical and chemical stability of the tailings.
23 June 2020
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.