B2Gold to buy AngloGold out of Gramalote

B2Gold to buy AngloGold out of Gramalote

Review will include the facility size and location, power supply, mining and processing options

Development

18 SEPTEMBER 2023
Orica and partners to teach STEM in Latin America

Orica and partners to teach STEM in Latin America

The partnership came about after STEM Punks was awarded US$300,000 from the Orica Impact Fund

Future of Mining

16 FEBRUARY 2023
Libero Copper extracts first Colombian copper

Libero Copper extracts first Colombian copper

Project was executed under a framework agreement with the National University of Colombia

Development

07 DECEMBER 2022
El Roble now operational

El Roble now operational

Atico resumed full production on April 24

Plant

26 APRIL 2022
Atico reports landslide near mine

Atico reports landslide near mine

It will take between two to three weeks to complete repairs and undertake circuit testing

Natural resources

07 APRIL 2022
Wheaton Precious Metals bullish on production

Wheaton Precious Metals bullish on production

For 2022, Wheaton expects gold production to remain unchanged.

Operational Excellence

07 FEBRUARY 2022
Atico Mining commissions dry stack facility

Atico Mining commissions dry stack facility

Upgrading the tailings facility to produce dry stack tailings also reduces water use.

Plant

14 JANUARY 2022
U3O8 Corp sells Argentine project

U3O8 Corp sells Argentine project

U3O8 will now focus on development of its Berlin deposit in Colombia.

Development

23 DECEMBER 2021
Colombia to leverage blockchain to boost transparency

Colombia to leverage blockchain to boost transparency

ANM has also recorded an SMA mining contract as a non-fungible token (NFT).

Supply chain management

10 NOVEMBER 2021
Nokia and AngloGold trial underground 5G in Colombia

Nokia and AngloGold trial underground 5G in Colombia

Trials featured tests on "mission-critical" mining use cases

Fleet

24 SEPTEMBER 2021
U3O8 reports membrane separation success for Berlin

U3O8 reports membrane separation success for Berlin

Next step is to undertake further membrane separation tests

Plant

14 JULY 2021
Cisneros back at capacity after mill maintenance

Cisneros back at capacity after mill maintenance

Colombia mine produced 1,922 oz gold in January.

Life-cycle / End of li...

08 FEBRUARY 2021