Metso Outotec wins US$110M Nornickel order

Finnish mining engineering group Metso Outotec has secured a 90 million (US$110 million) order for a nickel flash smelting furnace and a heat recovery boiler to be installed at Nornickel’s Nadezhda Metallurgical Plant.

Metso Outotec wins US$110M Nornickel order Metso Outotec wins US$110M Nornickel order Metso Outotec wins US$110M Nornickel order Metso Outotec wins US$110M Nornickel order Metso Outotec wins US$110M Nornickel order

Metso Outotec said its flash smelting tech has a sulfur dioxide capture rate of more than 99.9%

The contract includes replacement of the plant's existing smelting line with the latest process technology and furnace structures, to "significantly" increase the line's capacity and availability,