SURFACE

ScoZinc PFS sees production starting 9-12 months after financing

Production at ScoZinc's Scotia lead-zinc-gypsum mine can begin nine to 12 months after financing.

This article is 4 years old. Images might not display.

Production at ScoZinc's Scotia lead-zinc-gypsum mine can begin nine to 12 months after financing, according to its latest Pre-Feasibility Study.

The mine has been on care and maintenance since 2009, and requires little upgrade to operate efficiently, with initial capital expenditure estimated at approximately C$30.6 million.

The PFS projects an after-tax net present value of C$128 million at an 8% discount rate, with an after-tax internal rate of return of 65%. The payback period is 1.3 years, and estimated cumulative cash flow will be C$55 million for the first three years.

The mine is open-pit, with drilling and blasting required for 40% of the mining concessions.

The mine will have a life of 14.3 years, producing an average of 35 million pounds of zinc and 15 million pounds of lead in the first five years, with a processing throughput rain of 2,700 tonnes per day. The plant will process approximately 1 million tonnes per annum.

The concentrator plant was last in operation in 2009, at 2,200 tpd. Few upgrades are required to the comminution, flotation, and dewatering circuits to bring production levels to 2,700 tpd, the PFS found.

Most of the mine infrastructure is in place, with ScoZinc planning to spend C$5.3 million for equipment and spare parts.

The tailings storage facility is currently permitted for 8 million tonnes capacity. ScoZinc plans to expand capacity by 6 million tonnes, or use in-pit tailings deposal, at year six.

Half of the mineral resources are already permitted, and these activities can begin once financing is secured.

The Scotia Mine contains measured resources of 4.3 million tonnes grading 2.57% zinc, 1.32% lead, 3.83% zinc equivalent, and gypsum tonnage of 1.5 million tonnes grading 92.8%. Indicated resources are 21.1 million tonnes at 1.75% zinc, 0.92% lead, 2.64% zinc equivalent, with gypsum tonnage at 3.7 million tonnes grading 91.4% gypsum.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions