ABB has won orders worth around US$100 million from Rio Tinto for 17 distribution substations to support
13 March 2012
Kennecott Eagle Minerals has awarded Veolia Water Solutions & Technologies a contract for the wastewater
24 October 2011
Chinalco Yunnan Copper Resources has signed an earn-in agreement with an option to joint venture with
09 September 2011
BBE Consulting has completed a US$447,000 EPCM contract to design an underground cooling circuit at Rio
06 September 2011
Rio Tinto has chosen CiDRAs SONARtrac flow-monitoring systems for use on slurry lines at Oyu Tolgoi in
02 August 2011
BBE Consulting has completed a US$447,000 EPCM contract to design an underground cooling circuit at Rio
27 July 2011
Rio Tinto has chosen CiDRAs SONARtrac flow monitoring systems for use on slurry lines at Oyu Tolgoi in
01 July 2011
Rio Tinto selects ThoroughTecs CYBERMINE4 mining simulators for Oyu Tolgoi
08 June 2011
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.