ENVIRONMENT

Feasibility study at 15 Mile underscores value

15 Mile will use conventional gravity and carbon in leach cyanidation techniques

This article is 2 years old. Images might not display.

 The project, previously called the Fifteen Mile Stream, will utilise conventional gravity and carbon in leach cyanidation techniques to produce gold dore bars, replacing the flotation and gravity concentrates method.

The processing decision will allow for the reuse of the existing Touquoy processing plant, helping to drive down capital expenditure costs and improving overall gold recoveries from direct whole ore leach instead of leaching of concentrates, the company said.

Additionally, the revised design layout will create minimal disturbance while boosting capital and operating cost efficiency.

 "With this strong prefeasibility result, St Barbara will now focus on the preparation of an updated environmental and social impact assessment for this new standalone design of the 15 Mile project," said Andrew Strelein, managing director and chief executive.

He went on to note that the development will provide "hundreds" of well-paid jobs for residents while also remediating the historical tailings at the site.

"The feasibility study engineering is intended to be ramped up as we see progress towards environmental approval with the commencement of development entirely achievable in mid-calendar 2026," said Strelein.

Tailings management

Earlier this year, St Barbara received information requests from the Nova Scotian Minister of Environment and Climate Change regarding the environmental assessment of the proposal to deposit tailings into the Touquoy open pit.

The request followed concerns raised by some environmental groups and locals about the potential ecological impacts of the mine, including the disposal of tailings in the open pit.

The proposed method would deposit tailings from 15 Mile into the pit and then cover them with waste rock to reduce the risk of acid rock drainage and erosion.

In the statement, the company explained that the method was ideal because it reduces the environmental impact by eliminating the need for a new tailings dam.

 

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

ESG Index 2025: Benchmarking the Future of Sustainable Mining

The ESG Index provides an in-depth evaluation of the ESG performance of 60+ of the world’s largest mining companies. It assesses companies across 10 weighted indicators within 6 essential ESG pillars.

editions

Automation and Digitalisation Insights 2025

Discover how mining companies and investors are adopting, deploying and evaluating new technologies.

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.

editions

Future Fleets Insights 2025

Mining IQ Future Fleets Insights 2025 looks at how companies are using alternative energy sources to cut greenhouse gas emmissions