Solution can reduce water-sourcing and wet tailings management costs for the mine site.
01 March 2021
Newly integrated solution will be capable of connectivity of up to 12 kilometres.
22 February 2021
After water recovery and evaporation comes compaction, and then dry tails require dust suppression.
12 January 2021
Project involves the creation of a small dry-stack tailings area
22 December 2020
A planned reprocessing facility will have an annual capacity of 1.7 million tonnes.
18 December 2020
It has been five years since Fundao tailings dam disaster in Brazil.
15 December 2020
Gold-silver project first announced plans for commercial production in November 2019
04 December 2020
A freeze wall design provides full hydraulic containment of the ISR well field.
02 December 2020
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.