Company wants to leave the possibility open for an expanded plant capacity of 4Mtpa
30 March 2021
Vale plans four plants at an estimated total cost of US$2.3 billion.
17 March 2021
Vale is aiming to increase the proportion of its iron ore production through dry processing to 70%.
15 March 2021
The system classifies ore as product or waste, using a variety of sensors
11 March 2021
FIT stations have steel structures that are supplied in modules that fit easily into containers for
08 March 2021
Owner Horizonte awarded construction license in Brazil
25 February 2021
Appoints Maria Luiza de Oliveira Pinto e Paiva as head
22 February 2021
Boston Metal is developing a Molten Oxide Electrolysis (MOE) technology
09 February 2021
Slurry pumps are subject to a lot of stress, which can lead to failures and lost
ABB has developed a diverse range of electrification solutions.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions
A comprehensive review of current exploration rates, trending exploration technologies, a ranking of top drill intercepts and a catalog of 2022 Initial Resource Estimates and recent discovery successes.