Hatch optimises Sunrise Dam

Hatch developed a dynamic simulation model and performed a 16-week study to identify and fix logistical constraints standing in the way of the five-year capacity goal at AngloGold Ashanti’s Sunrise Dam gold mine in Western Australia

Hatch optimises Sunrise Dam Hatch optimises Sunrise Dam Hatch optimises Sunrise Dam Hatch optimises Sunrise Dam Hatch optimises Sunrise Dam

AngloGold Ashanti's Sunrise Dam gold mine in Western Australia

With open-pit operations coming to an end at the Sunrise Dam gold mine, continued viability of the mine will require a significant increase in haulage from its underground operations.