Outotec paste backfill system for Prominent Hill

Outotec paste backfill system for Prominent Hill

Outotec has won a contract to design and deliver a mine paste backfill system to Prominent Hill

Outotec wins mine paste backfill contract

Outotec wins mine paste backfill contract

Outotec has been awarded a contract to design and deliver a mine paste backfill system

Operational Excellence

24 JANUARY 2019
Goldcorp moving Towards Zero Water

Goldcorp moving Towards Zero Water

Goldcorp has reduced fresh water use through a water recycling project at Red Lake Gold Mines

Natural resources

07 NOVEMBER 2018
GR Engineering wins Fosterville EPC contract

GR Engineering wins Fosterville EPC contract

GR Engineering Services has been awarded a contract by Kirkland Lake Gold's Fosterville gold mine

GR Engineering bags EPC contract with Saracen

GR Engineering bags EPC contract with Saracen

GR Engineering Services has entered into an EPC contract with Saracen Gold Mines

Operational Excellence

24 AUGUST 2018

Paste picks up the pace

With the use of paste backfill becoming more popular at mining operations, Carly Lovejoy explores the...

Management

25 JANUARY 2012