Braveheart selects XRT ore sorting for Bull River

Braveheart selects XRT ore sorting for Bull River

Company plans to introduce ore sorting ahead of the grinding circuit

Plant

20 APRIL 2021
Braveheart kicks off Bull River ore sorting study

Braveheart kicks off Bull River ore sorting study

Company has appointed ABH Engineering for work at Bull River.

Operational Excellence

06 JANUARY 2021
Braveheart moves forward with hydropower plan for Bull River

Braveheart moves forward with hydropower plan for Bull River

British Columbia has scheduled a connection date of June 2021 for the Cranbrook mine.

Power / Remote power

08 DECEMBER 2020
Stantec wins Bull River TSF design contract

Stantec wins Bull River TSF design contract

Engineering group to design TSF for Braveheart in British Columbia.

Test results back at Braveheart's Alpine

Test results back at Braveheart's Alpine

Canadian junior said sorting test results were "positive" at Alpine

Operational Excellence

14 AUGUST 2018